Welcome to visit us!

[email protected]
logo logo

Bauxite Ball Mill In South Africa

So, what problems should be paid attention to when testing the bauxite mill no-load testhe continuous operation of the bauxite mill should be between 12-24 hoursf problems are found during operation, it should be solved in timefter passing the empty load plate to confirm the pass, the empty load no ball, no feed can be tested.

Copyright© 2019 FUMINE machinery all rights reserved.Sitemap